c

Fulton Street Transit Center A/C Mezzanine Reconstruction & J/M/Z Vertical Circulation

The $123 million contract A-36121 was awarded in July 2010 and involves reconfiguration of the
upper and lower mezzanines of the A/C Broadway/Nassau Station to allow for better passenger
flow and interface with the future transit center. It also provides improved vertical circulation
with the addition of two street elevators, three platform elevators and two escalators as well as
new multiple stairs throughout the station. This project also includes a new structural envelope at
the existing mezzanines utilizing new heavy steel girders across the mezzanine, thus eliminating
all center columns, new finishes at the A/C platform and mezzanines, upgrade to electrical and
communication systems, three new subway entrances and control areas and extended ADA
platforms at the J/Z subway.

Results

loading