Boston Logan International Airport Terminal C Checkpoint Consolidation and HVAC Improvements

VDC/BIM

Our team used BIM to manage MEP coordination with architectural and structural building systems and addressed a number of clashes during design development. The BIM model assured us that we could conduct the most cost-effective procurement process, plus it enabled us to communicate more effectively to stakeholders. We visually shared information about upcoming work, so stakeholders could understand how efforts would affect their operations. Also, we conducted a laser survey of existing conditions to obtain more accurate information since the as-built documents were produced before many changes were made to the existing structure and site. The use of BIM was a great success and delighted Massport so much that they awarded us their “Project of the Year” award.

Results

loading