Two tunnels 22-feet in diameter.


Construction of an underground station at 34th Street.


Excavation utilizing hard-rock TBMs, drill-and-blast, close-in blasting, extensive mechanical rock excavation and ground freezing.


Lowering of the existing track bed by nearly seven feet.


Project was completed five months ahead of schedule.